NANKAN
KUMAMOTO (Japan) | feb 23 - oct 23
Country:
JAPAN (Kumaroto)
Final Customer:
TTS
THJ Customer:
SRC JAPAN
THJ SOW STATUS: Finished
Duration: 9 month
DC TOTAL CAPACITY (MWp)): 38
DC THJ SCOPE (MWp): 38
INSTALLATION TYPE: PV Fix-tilt
PROJECT CATEGORY: Electrical installation
PROJECT HIGHLIGHTS: 38 MW utility-scale PV plant · Full electrical installation · Switching station connection · Adapted cable routing due to hard terrain
SCOPE SUMMARY: Full electrical installation from module to switching station.
MAIN EQUIPMENT MECH: «Structure: Powerway Fixed-tilt 37º Mac Steel (2x4x2 / 2x8x2 / 2x16x2) | Module: DMM»
MAIN EQUIPMENT ELEC: «Inverters / Transformers: TMEIC 3200 kW PCS / ABB RMU | SCB: ABB | Cables: Solar cable H1Z2Z2-K 4 mm2, DC Al 185 & 240 mm2, AC 120 mm2 20.8/36kV»
KEY CHALLENGES: Large-scale electrical installation project requiring coordination of installation activities across a utility-scale PV plant during the early development stage of THJ operations in Japan.