MAIBARA
SHIGA (Japan) | jun 24 - oct 24
Country:
JAPAN (Shiga)
Final Customer:
Vena Energy Japan
THJ Customer:
Negratin Japan
THJ SOW STATUS: Finished
Duration: 5 months
DC TOTAL CAPACITY (MWp): 32
DC THJ SCOPE (MWp): 32
INSTALLATION TYPE: PV Fix-tilt
PROJECT CATEGORY: Electrical installation
PROJECT HIGHLIGHTS: 32 MW utility-scale PV plant · Full DC and AC electrical installation · Urban construction constraints · Compressed schedule execution
SCOPE SUMMARY: Full electrical installation from module to PCS including trenches
MAIN EQUIPMENT MECH: «Structure: S-Rack 2V24 / 2V12 / 2V6 Tilt 30° | Modules: JINKO JKM625N-78HL4-BDV ( 50.640 units )
MAIN EQUIPMENT ELEC: «Inverters / Transformers: Sungrow SG3400HV-MV-30 + SG6800HV-MR | SCB: M-Tech 12/13 Strings | Cables: AC (Al 3kV CVT 60 & 150 & 200 mm2) / DC (Al 2xCV400 mm2) / solar cable (2x1500V 5.5 mm2)»