THJ Solar

KIZARASU

Electrical

CHIBA (Japan) | 2021

Country:
JAPAN (Chiba)

Final Customer:
Vena Energy Japan

THJ Customer:
Negratin Japan KK

THJ SOW STATUS: Finished

Duration: 3 month

DC TOTAL CAPACITY (MWp)): 25,6
DC THJ SCOPE (MWp): 25,6

INSTALLATION TYPE: PV Fix-tilt
PROJECT CATEGORY: Electrical installation

PROJECT HIGHLIGHTS: 25.6 MW utility-scale PV plant · Electrical installation works · DC and AC cable installation · Compressed construction schedule

SCOPE SUMMARY:Electrical installation inside PV plant

MAIN EQUIPMENT MECH:«Structure: S-Rack 4H17 / 4H16 / 4H9 / 4H5 / 4H4 Tilt 10° | Modules: Trina TSM-DEG20C-20 ( 43.857 units )»

MAIN EQUIPMENT ELEC: «Inverters / Transformers: Power Electronics Double Skid HEMK TWIN 33kV FS3670K (7600 kVA) (5 units) | SCB: Innergy Japan | Cables: AC (Cu 22kV CVT 100/250 mm2) / DC (Cu 2x1500V CV325 mm2) / solar cable (Cu 2x1500V 10 mm2)»

KEY CHALLENGES: Large-scale electrical installation project requiring coordination of installation activities across a utility-scale PV plant during the early development stage of THJ operations in Japan.