KASAMA
IBARAKI (Japan) | 2021
Country:
JAPAN (Ibaraki)
Final Customer:
Vena Energy Japan
THJ Customer:
Negratin Japan KK
THJ SOW STATUS: Finished
Duration: 4 month
DC TOTAL CAPACITY (MWp)): 53.34
DC THJ SCOPE (MWp): 53.34
INSTALLATION TYPE: PV Fix-tilt
PROJECT CATEGORY: Electrical installation
PROJECT HIGHLIGHTS: 53 MW utility-scale PV plant · Full electrical installation · DC and AC cable installation · Early THJ project in Japan
SCOPE SUMMARY: Electrical installation inside PV plant
MAIN EQUIPMENT MECH: Structure: S-Rack 3V22 / 3V11 / 3V6 / 3V5 Tilt 15°
Modules: Trina TSM-DEG20C-20 ( 91.179 units )
MAIN EQUIPMENT ELEC: Inverters / Transformers: Power Electronics Double Skid HEMK TWIN 33kV FS3670K (7600 kVA) (3 units)
SCB: Innergy Japan
Cables: AC (Cu 33kV CVT 60/150/250 mm2) / DC (Cu 2x1500V CV325 mm2) / solar cable (Cu 2x1500V 14 mm2)
KEY CHALLENGES: Large-scale electrical installation project requiring coordination of installation activities across a utility-scale PV plant during the early development stage of THJ operations in Japan.