THJ Solar

GOTEMBA

Electrical

SHIZUOKA (Japan) | jul 24 - dic 24

Country:
JAPAN (Shizuoka)

Final Customer:
Vena Energy Japan

THJ Customer:
SRC Construction Japan

THJ SOW STATUS: Finished

Duration: 6 months

DC TOTAL CAPACITY (MWp): 2
DC THJ SCOPE (MWp): 2

INSTALLATION TYPE: PV Fix-tilt
PROJECT CATEGORY: Retrofit

PROJECT HIGHLIGHTS: Operating PV plant retrofit · Replacement of stolen AC cables · Aluminium conductor installation · Repair of cable support infrastructure

SCOPE SUMMARY: DC main Copper cable replacement to Aluminium

MAIN EQUIPMENT MECH: «Structure: Fix-tilt 4Hx7 | Modules: 335 W»

MAIN EQUIPMENT ELEC: «String inverters | Cables: Solar cable ( 3,5 mm2) / AC (600 V Al 250,325 & 400 mm2)»